Saturday, 19 December 2009 15:58

Design criteria

Written by Graham
Rate this item
(0 votes)

An installation design must start with the supply characteristics including the earthing arrangements. In the UK and most parts of Europe this information is available from the Electricity distributor.All other details are to be provided by the designer. Earthing arrangements fall broadly into 3 types:

  • TN-S Supply has a seperate earth (typically the cable sheathing).
  • TN-C-S (ProtectiveMultipleEarthing) the supply has a combined neutral and earth.
  • TT. No earth provided by distributor, earthing achieved with earth rods locally.

Declared supply characteristics in the UK

  • 0.35Ω for PME supplies TN-C-S sytems.
  • 0.8Ω for separate earth supplies TN-S systems.
  • 21Ω where no earth is provided TT systems.

Prospective Fault Current Ipf
Will normally be given at 16kA and is sometimes higher in inner city  areas.

Last modified on Sunday, 20 December 2009 12:25
Graham

Graham

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Add comment